This check cord is a long, lightweight line made from round 3/8 inch rope, with a clasp that spins freely so the line is less likely to twist into knots. The handle is a double layer woven strap, and the join where it meets the rope is machine sewn for extra hold. Because the material does not soak up water, the line stays light even after a dip, and it floats if it drops into a pool or lake.
Use it for recall work, backyard play, hikes, camping trips or a day at the beach. It suits small, medium and large dogs, and the 30 foot length is a good middle option if you want more room than a standard leash without going as long as a 50 foot line. Since the color is orange, it is easy to see where your dog is at a glance.